Extreme Networks Altitude 4760 Series Guide d'installation Page 21

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 84
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 20
Altitude 4760 Series Access Point Ports and Connections
Altitude™ 4760 Series Access Point Installation Guide
21
Altitude 4760 Series Access Point Grounding Screw
The grounding screw is located to the right of the GE1/POE port and above the GND
symbol.
WARNING!
The grounding cable for an Altitude 4760 Series Access Point must be at a minimum a #10
gauge wire cross section.
The grounding cable can be attached to the unit using one of three recommended methods.
Using an 8mm socket and driver:
Loosen the grounding screw and insert the grounding cable into the hole below it.
Tighten the grounding screw to 30 inch pounds (lbf-in).
Loosen the grounding screw and wind the grounding cable around the screw. Tighten
the grounding screw to 30 inch pounds (lbf-in).
Attach a ring lug to the grounding cable and remove the grounding screw to attach the
ring lug to the Access Point. Secure it to the unit by reinserting the grounding screw.
Tighten the grounding screw to 30 inch pounds (lbf-in).
Vue de la page 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 83 84

Commentaires sur ces manuels

Pas de commentaire